Bluejay Mining notes ‘encouraging’ results from project in Finland

Archived article

Please note that tax, investment, pension and ISA rules can change and the information and any views contained in this article may now be inaccurate.

Bluejay Mining PLC on Monday said two holes were drilled in January at its Enonkoski joint-venture project with Rio Tinto PLC, with one of the holes returning ‘significant’ intervals of sulphide droplets.

The London-based mineral exploration and development company focused in Greenland and Finland,said drill hole ENON0028 intercepted a significant width of mineralised vari-textured pyroxenitic-noritic units with multiple intervals of nickel-copper sulphide droplet zones, as well as intervals of sulphide mineralisation.

The best mineralised interval yielded ore with a nickel content of 0.41%, whilst the remaining intervals within the sulphide droplet zones averaged 0.16% of nickel, Bluejay said.

The company said a total of 951.10 metres were drilled at the Enonkoski nickel-copper-cobalt project in eastern Finland. The drilling is part of a joint venture and an earn-in agreement with Rio Tinto, which consists of 1,000 to 1,500 metres of follow-up diamond drilling at the Laukunlapi target, two kilometres south-east of the Laukunkangas nickel-copper-cobalt mine.

Bluejay said geological and geophysical modelling is ongoing at the site, with the aim to determine targets for follow-up drilling of the intercepted mineralisation.

Chief Executive Officer Bo Moller Stensgaard said: ‘The results from the first 2023 drilling with Rio Tinto on the Enonkoski project are very encouraging with one of the drill holes returning significant intervals of sulphide-droplets, representing the highest sulphide content of any hole we have drilled in the Laukunlampi intrusion to date.’

Shares were up 3.0% at 3.00 pence in London on Monday morning.

Copyright 2023 Alliance News Ltd. All Rights Reserved.